Boiler Tube Replacement at Visy Coolaroo
Project Overview
Replacing sections of tubing in boiler. Welded and replaced 21 individual composite tubes either side of bull nose. Welded and replaced 2 individual 6 composite tube panels.
Full Weld traceability provided for QA documentation.
Location
Coolaroo
Technical Area
Engineering